Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 13, 2023

May 12, 2023

August 25, 2023

103 Winnebago St

Renovation

No Information to Display

$115,575.00

Public - State/Provincial

img_map_placeholder

103 Winnebago St, Oromocto, NB

Subscribe to View Full Documents

The work under this Contract includes, but is not limited to the following: .1 Replace existing Version 2 Delta DDC System with new DDC Points and as outlined in Appendix VII. .2 Contractor to provide controllers to accommodate all other new and existing points as outlined in points list. .3 Provide all programming and necessary components for 'Sequence of Operation' modifications. .4 Provide enhanced control strategies including: morning warm-up strategy to offset demand, occupied mode, NSB mode, low occupancy mode, PB-override, calendar schedule, ambient lockout, summer mode, SAT reset as oulined in the sequence of operations. .5 Provide MSTP network wiring with existing IntelliWeb system. Provide minimum 3 pair cable stranded twisted pair (FT4 rating in conduit; FT6 rating otherwise). .6 Provide appropriate end-of-line resistors to all device communication drop legs. .7 Provide all new points/sensors devices as outlined. Commissioning is required for all new points. .8 Provide all required modifications to electrical systems (i.e. including relays, contactors, transformers, switches, etc.) to make all control systems a complete operational package. .9 All power wiring to be in conduit. .10 All wiring in mechanical, electrical and service rooms or where it may be subject to damage shall be installed in conduit. .11 FT6 plenum rated cabling will be permitted in all ceiling spaces providing it is run parallel along a surface or perpendicular to it and neatly tied at 2m intervals. Where FT6 plenum cables are used without raceway or conduit, it shall be supported from or anchored to structural members using J-Hooks. .12 Cables shall not be supported by or anchored to ductwork, electrical raceway, piping or ceiling suspension systems. All other wiring to be in conduit. .13 All wire drops in occupied spaces shall be concealed in walls. Where access is impossible, surface drops will be enclosed in wire mold raceway. Color/paint to match existing wall. .14 Contractor to update existing graphics to reflect all new and existing points. .15 Contractor shall provide all new enclosures. .16 Contractor shall remove all redundant controllers, wiring, sensors and enclosures. .17 Integrate new controllers and graphics into existing Delta Inteliweb System. .18 Contractor to add new "CT" monitoring points into the existing Delta Energy Monitoring Software. Documents are available through the Construction Association of NB.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects