Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

December 16, 2024

Las Flores Canyon Rd

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Las Flores Canyon Rd, Malibu, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

Las Flores Canyon Road Drainage Improvements This project consists of replacing an existing 24" CMP with 24" RCP, tying into an existing catch basin and manhole located on Las Flores Canyon Road next to Las Flores Creek Park. Completion Time: 20 Consecutive Working Days Liquidated Damages: A. Failure to complete work on time: $500.00 Per Calendar Day (Sec. 6-9.1) B. Failure to keep traffic lanes open: $500.00 Per Hour (Sec. 6-9.2)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.