Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 27, 2023

No Information to Display

300 E Hospital Rd

Remodeling, Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

300 E Hospital Rd, Augusta, GA

Subscribe to View Full Documents

The objective of this design build project is for the Contractor to provide all labor, materials and equipment necessary to complete the design and repair- by replacement of the existing roof and lightening protection systems at the Building 300, DDEAMC, Fort Gordon, GA on the 14 (approximately 17,753 sf) and 15 (approximately 11,300 sq ft), replace damaged electrical conduit for the security cameras at the 14 floor roof and install a metal safety rail system at the 14 floor roof. New roofing shall have a total roof system warranty of minimum of 20 years. Laydown area will be provided for roofing materials. Contractor is responsible for all protection of water infiltration during the demo and installation work. Although the existing lightning protection system is operational, it may require upgrading and/or more adequate securing of the system. All work shall be performed in accordance with all installation, state, and Federal codes and laws, and those Specific Repair Requirements listed in paragraph 2.1.3.2. Work shall be coordinated with the Facility Management Division (FMD) office in DDEAMC. All work in conjunction with this task order shall provide a complete and usable product. *Amendment 02 and Updated RFI Report have been released. *Please see Amendment 03, attached for your review with changes of the wage determination to Georgia. *Please review the latest ProjNet Report with RFI's answered. 3/30 *RFI questions have all been answered and are available for your review and consideration. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.