Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 11, 2023

August 11, 2023

No Information to Display

50 Williams St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

50 Williams St, Hartford, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The entire elevator system, which comprises one (1) Low-Rise In-Ground Hydraulic Passenger Elevator 064-0158 installed at 50 Williams Street in Hartford, Connecticut, shall be maintained as hereinafter described, in accordance with the following detailed terms. Provide monthly examinations, adjustments, cleaning and lubrication of all machinery, machinery spaces, hoistways and pits. The contractor shall allocate a minimum of One (1) hour per quarter dedicated to routine scheduled preventative maintenance work. The Contractor shall maintain all parts of the elevators consisting of, but not limited to, machine, motor, generator, brushes, controller, selector, worm, gears, thrust bearings, brake magnet coil or brake motors, brake shoes, windings, rotating elements, contact coils, resistance for operating and motor circuits, magnet frames, leveling devices, cams, car and hoist way door hangers, tracks and guides, door operating devices and door motors, car lights, push buttons, indicators, hall lanterns and all other elevator signal scheduling, power drives, solid-state and/or computer devices and accessory equipment complete. The wages paid to any mechanic, laborer or workman employed upon the work here in contracted to be done shall be at a rate equal to the prevailing wage rate in the State of Connecticut and or federal government, whichever is applicable, for the same work in the same trade or occupation." Submit copies of all required business (trade & occupational) licenses with your response. The Owner, their Legal Representatives and the Elevator Consultant reserve the right to inspect the progress and quality of the work at any time to insure complete compliance with the specifications and other contract documents. Q&A Deadline 07/07/2023 2:00 PM Online Q&A Yes

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects