Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2023

July 17, 2023

September 9, 2026

FL-77

New Construction, Outdoor Lighting, Paving, Site Work

No Information to Display

$55,853,437.00

Public - State/Provincial

img_map_placeholder

FL-77, Chipley, FL

Subscribe to View Full Documents

Counties: Washington Road Name: SR 77 Limits: From N of Rogers Rd to S of Cane Mill Rd Project(s): 21790965201(*) Federal Aid No: D322007B Project(s): 21790965603 Federal Aid No: D322007B Total Roadway Length: 3.469 Miles Contract Days: 1150 Total Bridge Length: 0.012 Miles Total Proposal Length: 3.481 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Standard For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. The improvements under this contract consist of the reconstruction of SR 77 from north of Rogers Road to just south of Cane Mill Road for a distance of 3.481 miles in Washington County. The work under FPID 217909-6-52-01 includes widening the existing two-lane roadway to a four-lane divided typical section north and south of the Town of Wausau. The new four-lane rural typical section will consist of two 12-foot travel lanes in each direction separated by a 40- foot depressed median and 10-foot outside shoulders, 5-foot paved. Generally, within the Town of Wausau the typical section will transition to a five-lane undivided urban typical section with 6-foot sidewalks along each side. Stormwater ponds and improved roadside ditches, outfalls, side drains, culverts and inlets are included in the construction. Constructing two new bridges (Bridge Nos. 610167 and 610168) over Reedy Creek north of Wausau replacing existing bridge culvert ID 610011 and a new bridge (Bridge No. 614170) over Reedy Creek on Finch Circle to replace the existing concrete box culvert are included in the work. The work under FPID 217909-6-56-03 includes the replacement of the existing 6" water main with a new 8" water main for the Town of Wausau. Included in this will be constructing the new water main while maintaining service to residents and businesses along the corridor. New service connection under the new roadway and resetting meters will be required. The new water main starts just north of Barbrich Road and will extend north of Bonnie Lane where it currently ends to the new alignment of Finch Circle where it will reconnect to an existing 6"water main, approximately 2.4 miles. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Add Lanes and Reconstruct

61 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.