Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

July 1, 2025

September 30, 2028

Multiple Locations

Renovation

No Information to Display

$70,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Seattle, WA

Subscribe to View Full Documents

The BT014 Project will be responsible for the installation of bus station shelters, furnishings, and systems on top of existing platforms that will be installed by others. The Project has a total of 25 separate station locations along I-405, SR 518, SR 522, and I-5 encompassed by the S1, S2, and S3 Lines. Typically, the locations will have a platform for each direction of travel or will be in a Transit Center. The scope of work also includes the following unique elements including Installation of battery electric bus (BEB) inductive charging stations at five (5) different station locations (Shoreline, Lynnwood, Bothell, Burien, Bellevue). Elements of this include bus charging system, AC charging cabinet, 480V power switchboard, transformer, conduit and wire installation, canopies for the equipment, and security fencing/screening. Additionally, the project scope will include retrofitting various existing stations such as the Bellevue Transit Center, Totem Lake Station, Lynwood Transit center, and various Pedestrian Bridges and Entry Structures. Any questions regarding the RFQ should be directed to Bryan Lammers via email Bryan-Lammers@hoffmancorp.com Construction on the BRT Stations contract is scheduled to begin in Q3 2025. Construction must be substantially complete by Q3 2028. RTA/OA 0206-19

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.