Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

January 16, 2024

75 Myrtle St

Renovation

No Information to Display

$170,530.00

Public - City

img_map_placeholder

75 Myrtle St, Somerville, MA

Subscribe to View Full Documents

The Project consists of: Replacement of intercom system The inspection is an opportunity to visit and observe the site only. Any oral interpretations offered at the site inspection are non-binding. Any questions must be submitted in writing to the Designer, at the e-mail address on the Project Manual cover, no later than 4:00 PM on the Friday prior to the date stated above for the receipt of bids. Questions after that time may not be responded to, at the sole discretion of the designer. In accordance with the General Conditions, the Work shall start as stated in the Notice to Proceed and shall be complete within 120 consecutive calendar days

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.