Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 2, 2024

No Information to Display

To Be Determined

Addition, Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Atlanta, GA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Design Professional Services for Project No. J-348-DP "Expansion of Tech Square, Phase IIIB", Georgia Institute of Technology, Atlanta, Georgia. Please refer to the RFQ/RFP document for instructions. As of July 10, 2023, a design team has been identified yet. A construction timeline has not been established yet. *The previous closed solicitation is listed below for reference. Expansion of Tech Square, Phase III project is compromised of the design and construction of 2 distinct towers (14 and 18 floors) that is approximately 416,500 GSF to house the expansion of the Scheller College of Business (SCOB), Stewart School of Industrial and Systems Engineering (ISyE), economic and business development programs, classrooms, retail, and parking. The scope of the Expansion of Tech Square, Phase IIIA project consists of the design and construction the building’s core and shell, and the interior buildout of portions of instructional space, building support, sitework and retail shell. This project is in the design development stage and is funded through Public Private Venture (PPV). The scope of Phase IIIB (subject of this RFQ/RFP) consists of the interior buildout of the remaining shelled interior space compromised of approximately 175,000 GSF; housing program areas related to SCOB, ISyE, and components of instructional space of the building. For a full building program for Phases IIIA & IIIB, see Exhibit G. The intent for the Phase IIIB interior buildout of the shelled spaces is to work seamlessly with the Phase IIIA design language. The design of Phase IIIB should be economical, durable, and full of delight that highlights specific programs in a focused thoughtful manner. Interiors should give function and identity to the user groups while working harmoniously with the building architecture and infrastructure. Long life, loose fit, and low energy is a priority idea as Phase IIIB will be long-term owner occupied that must be flexible for changing needs and users. The Design Professional’s services are anticipated to commence by June 2023 with construction documents anticipated for completion in December 2024. The start of construction is contingent on the availability of funding.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.