Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2023

July 28, 2023

November 24, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Easton, MD

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

***** AMENDMENT 0001 6-8-2023 ***** Poplar Island is an ecosystem restoration project located in the upper-middle Chesapeake Bay in Talbot County, Maryland, approximately 39 miles south-southeast of the Port of Baltimore and two miles northwest of Tilghman Island.The primary purpose of this contract is to repair two existing spillway structures and plug and abandon several unused spillway structures. Poplar Island utilizes spillway structures to discharge water from inside the island, under the perimeter dikes, and out to the Chesapeake Bay. Each spillway consists of two 36-inch corrugated metal pipes of approximately 100 ft in length, which are controlled by individual sluice gates. The Spillway Rehabilitation work consists of slip ling four 36-inch corrugated metal pipes with HDPE pipes, and minor structural repairs to the sluice gates and appurtenant features. Abandonment work will include filling and capping between four and eight 36-inch corrugated metal pipes to prevent long term impacts to the islands perimeter dikes. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. All work will be performed within Cells 1, 3, 4, and 5 of Poplar Island, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The anticipated period of performance is approximately 120 calendar days.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.