Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

May 14, 2024

November 13, 2025

354 Pickerel River Rd

New Construction, Site Work

No Information to Display

$7,000,000.00

Public - County

img_map_placeholder

354 Pickerel River Rd, Pickerel, ON

Subscribe to View Full Documents

Stage II tender to PREQUALIFIED firms only. Question Deadline: 10/27/2023 at 4:00 PM ET Henvey Inlet First Nation has identified the need to construct a new Health Centre. The Health Centre site is located at 354A Pickerel River Road, Pickerel Ontario. Smoke Architecture, Tulloch Engineering Inc., and Piotrowski Consultants Ltd. were retained by Henvey Inlet First Nation to provide the architectural and engineering services to carry out the design for the construction of the new Health Centre. The proposed Health Centre will be located at the same site as the existing Health Centre. The proposed Health Centre will consist of a 1,025 m2 one storey building with several offices, a staff room, community wellness room, boardroom, washrooms, mechanical room, teaching kitchen and a meals on wheels to name a few. Scope of the work to be carried out under this Contract. Generally, without limiting the scope of the project, the work covered by this pre-qualification covers the following: -Prepare the site (e.g., excavation) -Connect to the existing watermain to supply potable water to the proposed Health Centre. -Supply and install a Class 4 septic system -Site grading, including partial removal and replacement of the existing parking lot -Construction of a new one-storey 1,025 m2 Health Centre *Construction - 12 to 18 months.

44 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.