Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 20, 2025

No Information to Display

321 Wisconsin Ave

Renovation

No Information to Display

$2,405,000.00

Public - City

img_map_placeholder

321 Wisconsin Ave, Waukesha, WI

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Fire Department and Department of Public Works have been sharing the former Incinerator building as a training site for the Fire Department and a recycling center/storage site for the Department of Public Works. The facility has been maintained using operating budgets and CIP funds. In 2023, construction of our burn building to conduct live fire training evolutions and construction of a bathroom in the training facility will be completed. The CIP plan has been modified from the 2023 budget to provide a more comprehensive approach to creating a weather tight structure and address the distressed appearance of the structure. In 2024, the rusting pollution control structure would be removed (next to the recycling center), the first phase of the roof replacement, and door security system installation would be completed. in 2025, the second phase of roof replacement, replacement of exterior metal cladding, and first phase of electrical work would be accomplished. In 2026, the second phase of the electrical work, masonry repairs, window replacement and installation of translucent panels would be done. In 2027, funds are being allocated to enhance the fire training props within the building. This project is included in the city’s fy 2024-2028 Capital Improvement Program. As of April 2, 2024, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.