Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 1, 2025

No Information to Display

220 Eastern Pkwy

LEED Certification, Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

220 Eastern Pkwy, Louisville, KY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe to View Full Documents

Commissioning services for JB Speed School Student Success Building The University of Louisville (Owner) is requesting proposals for building systems commissioning services for the design phase of the JB Speed School Student Success Building Project. The project scope is a single-phase, 4-story, 116,000 ft2 building at University of Louisville Main Campus in Louisville, KY. The program includes a multi-purpose building (classrooms, labs, engineering garage) targeting LEED v4.1 BD+C certification. Proposals shall include fees for DESIGN PHASE commissioning activities only. The project schematic design is not complete, and the final building program and systems are not yet determined. After construction documents have been completed (including the commissioning specification) the owner will conduct an additional RFP for Construction Phase commissioning activities. The project is currently in the Schematic Phase. The scheduled release of 100% Construction Documents is October 29th, 2023. The construction is targeted to commence January 01, 2024 with occupancy in July 01, 2025. The owner is committed to commissioning this facility, to systematically optimizing the building and its ancillary systems, and to meeting the requirements of LEED-v4.1EA P1 Fundamental Commissioning and EA C3 Enhanced Commissioning (Enhanced and Monitoring-Based Commissioning Path & Building Enclosure Commissioning Option). The commissioning agent (CxA) will provide the signed letter template and suitable documents for the required credits before termination of contract. The CxA will be hired by the owner and report directly to the owner. The CxA shall be independent to the project and may not be an employee of the owner, design consultants, or interested contractor. The project is required to achieve LEED Siler Certification at a minimum. The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.