Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 9, 2023

April 10, 2023

December 6, 2023

Multiple Locations

Site Work

No Information to Display

$469,058.00

Public - City

img_map_placeholder

Multiple Locations, Glasco, KS

Subscribe to View Full Documents

Installation of approximately 4,830 linear feet of 8" Cured-In-Place Pipe (CIPP) and approximately 2,700 linear feet of 10" CIPP, including pre-construction televising and cleaning, point repairs, sewer main removal and replacement, post-construction televising, and the reinstatement of existing service laterals; the installation of two new concrete manholes; the installation of approximately 1,750 linear feet of 6" PVC forcemain, including bored stream crossing, gate valves, and associated connections to existing infrastructure (Base Bid); the installation of approximately 3,020 linear feet of 8" CIPP, including pre-construction televising and cleaning, point repairs, sewer main removal and replacement, post-construction televising, and the reinstatement of existing service laterals (Bid Alternate 1); the installation of approximately 1,460 linear feet of 8" CIPP, including pre-construction televising and cleaning, point repairs, sewer main removal and replacement, post-construction televising, and the reinstatement of existing service laterals (Bid Alternate 2); the installation of approximately 1,000 linear feet of 8" CIPP, including pre-construction televising and cleaning, point repairs, sewer main removal and replacement, post-construction televising, and the reinstatement of existing service laterals (Bid Alternate 3); the rehabilitation and cementitious/polyurethane lining of 24 existing manholes (Bid Alternate 4); the installation of a standby generator with automatic transfer switch and propane tank (Bid Alternate 5); and the installation of a trailer-mounted, electric wastewater pump (Bid Alternate 6). Direct all questions to Jared Brooks, jbrooks@schwab-eaton.com, 785.539.4687

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects