Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 28, 2023

April 28, 2023

December 6, 2023

Multiple Locations

Site Work

No Information to Display

$2,080,033.00

Public - City

img_map_placeholder

Multiple Locations, New Hope, MN

21

38

6

5

Subscribe to View Full Documents

The Project consists of the following approximate quantities for the Base Bid: 6,504 LF Remove and Replace Concrete Curb and Gutter 36,246 SY Reclaim and Shape Bituminous Pavement 6,315 SY Mill Bituminous Pavement (depth 2) 52 EA Remove and Replace Sanitary Sewer Frame and Rings With HDPE Rings and Frames 4,455 LF 6 PVC Watermain, C900-DR18, With Tracer Wire 5,376 TN Aggregate Base, Class 5 (Special) 8,025 TN Type SP 9.5 Wearing Course Mixture Along with miscellaneous utility improvements, removals, restoration, and correlated appurtenances. Furnishing of all labor, materials, and all else necessary for the following: 2023 Infrastructure Improvements Project - City Project No. 1090 In general, Work consists of the replacement of watermain, storm water and street improvements. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. For this project, the City will only accept online electronic . Direct inquiries to Engineers Project Manager, Ann Ackerson, at (651) 395-1768, or ann.ackerson@stantec.com. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. substantially complete on or before October 20, 2023, Final completion- December 6, 2023.

51 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects