Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2023

March 1, 2024

No Information to Display

Multiple Locations

Demolition, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, San Francisco, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

University reserves the right to accept late submissions and to request, receive, and evaluate supplemental information after the above time and date at its sole determination. Swinerton Builders has entered into a CM-at-Risk contract with the University of California, San Francisco Medical Center for this project. Swinerton has determined that the shoring trades who submit bids on this project must be prequalified and will be conducting the prequalification process. Prequalified bidders will be required to have the following California contractor's license Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The UCSF Mount Zion site includes seven (7) above grade buildings, one (1) below grade building, underground foundations of a ninth building that was demolished and a service yard at the center of the campus. It is bounded by Divisadero, Sutter, Scott and Post Streets. The Site Preparation scope includes demolition of three (3) of the existing buildings of which one shares a wall with an HCAI-1 building that remains. The Bulk O2, Trash Compactor and EH&S Staging areas will need to be relocated within the existing Service Yard. After completion of the Site Preparation work, and under a separate contract not included in this project, construction for an Outpatient Center (OPC) with approximately 220,000 sf of building that includes one level below grade and up to eight levels above grade will commence. The entire OPC will be an HCAI-3 building.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects