Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

January 8, 2024

No Information to Display

1450 Columbia Hwy

Remodeling, Renovation

No Information to Display

$30,000,000.00

Public - County

img_map_placeholder

1450 Columbia Hwy, Estill, SC

Subscribe to View Full Documents

The project is the Estill High School Conversion to Elementary School. The school was an existing high school serving this Estill area. This project will consist of select demolition of 8 existing high school classrooms to convert them to elementary classrooms. The scope consists of miscellaneous concrete and masonry demolition and patching, miscellaneous structural steel, new casework, fire-stopping, new hollow metal doors and frames, hardware, sheet rock, acoustical ceilings, resilient flooring, acoustical panels, painting, division 10 accessories, and mechanical, electrical, and plumbing. Performance and Payment bond may be required in the amount equal to one hundred percent (100%) of the contract price; therefore, subcontractors and suppliers should be prepared to state the amount necessary as an alternate amount, independent of their proposal for work, should it be determined by the General Contractor to require these bonds. All questions regarding the bid documents shall be directed to: Ryan Reynolds [estimating@hgreynolds.net] H.G. Reynolds Company Inc. 113 Contract Drive Aiken, SC 29801 803.641.1401 ext. 220 Fax: 803.641.1037 This project consists of renovation within the former Estill High School. Work includes, but not limited to, select demolition, reconfiguration of interior walls, renovations of existing restrooms, replacement of wood doors, replacement of ceiling tiles and lighting, interior finishes, plumbing, mechanical, and electrical work as necessary to complete the project.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.