Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 2, 2025

October 31, 2026

Bd Guillaume-Couture

Paving, Site Work

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

Bd Guillaume-Couture, Levis, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project to implement priority measures for public transit on Guillaume-Couture Boulevard, between Alphonse-Desjardins Boulevard and rue Saint-Omer, including the transition to the east of rue Saint-Omer - Section 2. The project consists in particular of the: Complete redevelopment of the boulevard; Addition of a reserved lane per direction, for public transport; Repair of underground infrastructures; Addition of one-way bike paths; Addition of new bus shelters; Complete repair of traffic lights and lighting; Modification and relocation of public utilities. The section targeted by this call for tenders (Section 2) is located in the Desjardins borough on Guillaume-Couture Boulevard, between Alphonse-Desjardins Boulevard and Saint-Omer Street, for an approximate length of 1,300 meters. The intersection of boulevard Alphonse -Desjardins and boulevard Guillaume-Couture is excluded, but that of rue St-Omer with boulevard Guillaume-Couture is included. The approximate length of the work includes about 300 meters east of Saint-Omer Street to make the transition from the six (6) planned lanes to the four (4) lanes of the existing land. This section is part of an overall project totaling nearly 3 km of road expansion. The other sections, for which professional engineering services were carried out through other mandates, are as follow: Borough of Desjardins: Section 3 (0.6 km + transition) located between Route du Président-Kennedy and Boulevard Alphonse-Desjardins . Chutes-de-la-Chaudière-Est borough: Section 9 (1.1 km + transition) located between chemin du Sault and rue de Mercure. TIMELINE: Design is underway. Working drawings are to be completed by December 12, 2024. Further update in spring, 2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.