Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2025

No Information to Display

2150 Lake Shore Blvd W

LEED Certification, New Construction, Site Work

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

2150 Lake Shore Blvd W, Toronto, ON

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Construction of new Park Lawn GO Station, with the platform spanning Park Lawn Road, and creating another stop on the Lakeshore West Line. The project will be constructed as part of the master planned community at 2150 Lakeshore Boulevard. The station will span Park Lawn Road and feature access points on either side of the street and on both sides of the rail corridor and interfacing with the proposed redevelopment of the site. A standalone north station building will be constructed at the intersection of Park Lawn and a yet-to-be-named public street serving the new community. Another south station building will be directly integrated into the first phase of development at 2150 Lake Shore, with access to the station from both Park Lawn Road and another planned and currently unnamed street. The buildings will be connected via a below-grade tunnel that runs beneath the rail corridor for easy access to both sides of the platforms. A third access point will be provided via a vestibule on the west side of Park Lawn, creating a quick path to the west end of the platform. New streetcar infrastructure will be added for better connectivity with TTC service. The Park Lawn GO Station has been designed to address both Toronto Green Standard (TGS) and LEED Silver requirements. TIMELINE: Site plan was submitted to the city of Toronto for approval October 2022. Detailed designs are underway with schedules for working drawings, tender and construction will be finalized pending approvals. Construction may proceed with, or alongside the development of the 2150 Lake Shore Residential Development, followed separately.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects