Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2023

February 9, 2023

May 10, 2023

Willow Wood Cir

Paving, Site Work

No Information to Display

$334,412.00

Public - City

img_map_placeholder

Willow Wood Cir, Dallas, TX

Subscribe to View Full Documents

Improvements to the Teddy Bear Garden including the construction on of a pedestrian ramp, landscape walls, site grading, sidewalk improvements, and alley improvements. The project site is located at Lakeside Park in Highland Park, Texas. The project, as currently planned, will consist of a sidewalk and ramp connecting the area of the Teddy Bear statues to the existing pedestrian bridge path. A small retaining wall with a maximum height of approximately 3 feet is also planned. Plate A.1, Plan of Borings, depicts the project vicinity and approximate locations of exploration borings. The purpose of this geotechnical engineering study has been to determine the general subsurface conditions, evaluate the engineering characteristics of the subsurface materials encountered, and develop recommendations for the type or types of foundations suitable for the project. To accomplish its intended purposes, the study has been conducted in the following phases: (1) drilling sample borings to determine the general subsurface conditions and to obtain samples for testing; (2) performing laboratory tests on appropriate samples to determine pertinent engineering properties of the subsurface materials; and (3) performing engineering analyses, using the field and laboratory data, to develop geotechnical recommendations for the proposed construction. The design is currently in progress and the locations and/or elevations of structures could change. Once the final design is near completion (80- to 90-percent stage), it is recommended that CMJ Engineering, Inc. be retained to review those portions of the construction documents pertaining to the geotechnical recommendations, as a means to determine that our recommendations have been interpreted as intended. The project generally includes improvements to the Teddy Bear Garden including the construction of a pedestriam ramp, landscape walls, site grading, sidewalk improvements, and alley improvements. Question deadline is January 5, 2023 at 2:00 p.m. Questions must be submitted by email prior to the question deadline.

53 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.