Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 12, 2023

February 27, 2023

December 21, 2023

State Hwy 8

Paving, Site Work

No Information to Display

$453,450.00

Public - State/Provincial

img_map_placeholder

State Hwy 8, Franklin, PA

Subscribe to View Full Documents

This project is the construction of approximately 1.19 miles from SR 0008/Segment 0580/Offset 0868 to SR 0008/Segment 0590/Offset 0828, SR 0417/Segment 0030/Offset 0055 to SR 0417/Segment 0040/Offset 0300, and SR 3025/Segment 0110/Offset 0082 to SR 3025/Segment 0120/Offset 0075 including application of a high friction surface treatment, base repairs, and pavement markings as indicated on the approved drawings included in the Bid Package. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS PennDOT -SR 8 - Venango Co. HFST

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects