Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2023

January 1, 2024

December 31, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

$8,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Fort Riley, KS

Subscribe to View Full Documents

Amendment 0001 corrected the Period of Performance of Base year and option years to reflect the 6-month -8 extension of the current Road Maintenance Contract in SF 1442: Block 21. Base Year: PoP 01-JUL-2023 to 30-JUN-2024 was changed 01-JAN-2024 to 31-DEC-2024 Option 1: PoP 01-JUL-2024 to 30-JUN-2025 was changed 01-JAN-2025 to 31-DEC-2025 Option 2: PoP 01-JUL-2025 to 30-JUN-2026 was changed 01-JAN-2026 to 31-DEC-2026 Option 3: PoP 01-JUL-2026 to 30-JUN-2027 was changed 01-JAN-2027 to 31-DEC-2027 Option 3: PoP 01-JUL-2027 to 30-JUN-2028 was changed 01-JAN-2028 to 31-DEC-2028 Bidders shall acknowledge this amendment by completing blocks 15A-C of this SF30 and block 19 of the SF1442. No other changes to the terms and conditions of this solicitation are made or implied.Work under this requirement consists of a construction, removal, replacement, and repairs associated with roadway and airfield projects at Ft. Riley, KS, including removal, replacement and repair of existing subgrade, utilities, shoulders, curbs, gutters, sidewalks, and other real property common to roadway and airfield pavements. Work may also include minor "new construction", to include construction of new roads, new sidewalks, or new parking lots, or seeding operations based on the seeding season outlined in the KDOT Standard Specifications Section 904 Table 904-1 (https://www.ksdot.gov/bureaus/burConsMain/specprov/2015specprov.asp) . Work will be provided under multiple firm-fixed-price task orders issued as provided in the parent IDC contract. Each task order may involve a variety of construction trades. The Contractor shall provide all materials, labor, equipment, tools, transportation, and ancillary items necessary to complete each project from conception to completion.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects