Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 20, 2023

May 31, 2024

To Be Determined

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

To Be Determined, Des Moines, IA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Des Moines Water Works (DMWW) is requesting proposals from consulting firms (Consultant) to provide engineering services as required for the L.D. McMullen Water Treatment Plant - Chemical Feed Improvements project. The services will generally include surveying, design, bidding, construction, contract administration, and cost estimating. The objective of the Project is to complete the chemical feed improvements at the L.D. McMullen water treatment plant. Scope of work that will need to be designed and constructed includes: Evaluation of existing PAC equipment, sizing, and piping to determine if replacement or upgrading is needed. Installation of a new redundant PAC feed system with dust collection; review the existing abandoned soda ash system to see what can and cannot be re-used. The preference is the silo will be reused if possible. Demolition of old soda ash equipment. Replacement of existing ferric chloride tanks, valves, and instrumentation. Building modifications to remove/replace ferric chloride tanks. Sealing hypochlorite room from ferric chloride room. Replacement of underground ferric chloride piping system with carrier piping and intermediate underground vaults between chemical building and splitter box. Project Start January 2023 Complete Design and Bidding Documents June 2023 Bid Project August 2023 Complete Construction May 2024 The design of this project was completed by the owner's in-house design professional. The method of Contractor Selection has not been Determined at this time. As of August 22, 2023, no new information available

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.