Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2026

No Information to Display

2940 Baranof Ave

Site Work

No Information to Display

$580,000.00

Public - City

img_map_placeholder

2940 Baranof Ave, Ketchikan, AK

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Update:https://www.kgbak.us/DocumentCenter/View/12831/KGB-Capital-Improvement-Plan-2025-2029-FINAL FY2025 Paint: The school has not been repainted since 1999 and is in need of repainting. This project will be combined with other district painting projects. ($150,000) FY 2025 Install Pad-Mounted Transformer: Design to replacement of the utility transformers with a new one on a pad outside of the boiler room. ($30,000) FY 2026 Addition of Covered Play Area: Installation of covered playground to south side of school to separate small children from large. ($150,000) FY 2027 Replace Pad-Mounted Transformer: Replacement of the utility transformers with a new one on a pad outside of the Project is included Ketchikan Gateway Borough Fiscal Year 2025-2029 Page no 72 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- FY 2023 Reroute Watermain: Replace original school construction cast iron pipe with HDPE pipe from the school to the street utility valve. ($110,000) FY 2023 Replace Small Play Structure: The play ground on the "big kid side" closest to Thatcher Way has far exceeded its useful life and much replaced. ($160,000) FY 2025 Install Pad-Mounted Transformer: Replacement of the utility transformers with a new one on a pad outside of the boiler room. ($300,000) FY 2025 Addition of Covered Play Area: Installation of covered playground to south side of school to separate small children from large. ($150,000) FY2026 Paint: The school needs to be painted ($55,000) Project is included Ketchikan Gateway Borough FY 2023-2027 ClP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.