Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 2, 2023

July 28, 2024

Harrison St & Ingalls Rd

Renovation

No Information to Display

$1,241,691.00

Public - City

img_map_placeholder

Harrison St & Ingalls Rd, Hampton, VA

Subscribe to View Full Documents

Remove roofing, railing, structural, and millwork items indicated for replacement or reuse The Owner may at any time, by written order utilizing the Change Order (CO-11) and without Notice to the sureties, make changes in the Work which are within the general scope of the Contract, except that no change will be made which alone will increase the total Contract Price to an amount more than twenty percent (20%) in excess of the original Contract Price without Notice to sureties. At the time of the Preconstruction Meeting described in Section 50(b), the Contractor and the Owner shall advise each other in writing of their designees authorized to accept and/or approve Change Orders and of any limits to each designee's authority. Should any designee change or the limits of their authority change, the party initiating such change in designee or authority shall give written Notice to the other Party and the A/E within seven (7) Days. The Contractor agrees and understands that the authority of the Owner's designee is limited by Code of Virginia,2.2-4309 and any other applicable statute. Change Orders shall be effective when signed by both parties, unless Governor approval (or by his or her designee) is required, in which event the Change Order shall be effective when signed by the Governor or his or her designee. The Owner as obligee in an amount equal to five percent (5%) of the amount of the bid (the "Bid Bond") The Project consists of the select replacement and repairs of roof and railings at six existing buildings - 171, 143, 144, 141, 142, and 119. Roofing materials includes EPDM, slate, concrete pavers, standing seam metal, copper, and terne-coated stainless steel. Wood railings will be constructed to replicate the historic raiings. Structural repairs will be made at Buildings 143 and 144..

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.