Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
December 7, 2022
February 6, 2023
January 2, 2024
CR 208
Site Work
No Information to Display
$2,309,900.00
Public - County
CR 208, Saint Augustine, FL
The project involves constructing a new ground storage tank and installing related pipe work underneath the tank for the CR 208 Water Booster Pump Station project. The awarded contractor will be responsible for coordinating with the general contractor that will be responsible for the construction of the CR 208 Water Booster Pump Station Facility. All work is to be performed in accordance with the specifications and plans provided within the solicitation. Bid Bond 5% St. Johns County reserves the right to accept or reject any or all bids/proposals, waive minor informalities, or award the bid/proposal which best serves the interests of St. Johns County. The work for this Contract is located on property owned by St. Johns County Utility Department (SJCUD) at 3575 Agriculture Center Drive St. Augustine, Florida, within County easements, and within St. Johns County (SJC) right-of-ways (ROWs). A. Furnish all labor, materials, equipment, and incidentals required to access the site, construct a new 3.0 MG (nominal volume; 2.8 MG useable volume) potable water ground storage tank, install the water main and reclaimed water main, and construct the new booster pump station and electrical building as shown on the Drawings and as specified herein B. The project will be executed through three separate contracts - Contract 1 includes the construction of the prestressed concrete ground storage tank by the TANK CONTRACTOR, Contract 2 includes electrical and I&C procurement and installation by the ELECTRICAL CONTRACTOR, and Contract 3 includes the construction of the booster pump facility and all other associated work as shown on the Drawings. The CONTRACTOR will be required and should include in their base bid all costs associated with coordinating their work with the TANK CONTRACTOR and ELECTRICAL CONTRACTOR including scheduling of work that is to be completed 1. Mobilization/demobilization, general requirements, bonds, and insurance 2. Site work a. Clearing and grubbing for the entire site property b. Excavation of pond from existing grade and import of structural fill for GST construction c. Sedimentation and erosion control measures 3. 3.0 MG nominal volume GST including all appurtenances as described in Section 13216 4. Installation of all "under" piping related to the GST. Appendix C provides a summary of what piping and fittings have been pre-purchased by the OWNER and will be provided to the TANK CONTRACTOR for installation. All other piping related to the tank shall be provided by the TANK CONTRACTOR. 5. Unloading, storage, and installation of any piping and fittings pre-purchased by the OWNER for construction of the tank 6. All materials testing required during construction 7. All permits necessary to complete the work on the tanks after it is constructed and sequencing the ELECTRICAL CONTRACTOR's work with their own. SJCUD Project No.: 4488-56302-6264-56302
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Saint Augustine, FL
Bid Date: Jan 17 2024
Saint Augustine, FL
Bid Date: Sep 25 2024
Saint Augustine, FL
--
Saint Augustine, FL
Bid Date: Oct 08 2024
Saint Augustine, FL
Bid Date: Sep 18 2024
Saint Augustine, FL
--
Saint Augustine, FL
Bid Date: Nov 08 2023
Saint Augustine, FL
Bid Date: Jun 14 2023
Fort Myers, FL
Bid Date: Nov 11 2023
Naples, FL
Bid Date: Oct 23 2023
Jacksonville, FL
--
Orlando, FL
Bid Date: Oct 23 2023
West Palm Beach, FL
Bid Date: Aug 17 2021
Miami, FL
--
Sanford, FL
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
