Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 7, 2022

February 6, 2023

January 2, 2024

CR 208

Site Work

No Information to Display

$2,309,900.00

Public - County

img_map_placeholder

CR 208, Saint Augustine, FL

Subscribe to View Full Documents

The project involves constructing a new ground storage tank and installing related pipe work underneath the tank for the CR 208 Water Booster Pump Station project. The awarded contractor will be responsible for coordinating with the general contractor that will be responsible for the construction of the CR 208 Water Booster Pump Station Facility. All work is to be performed in accordance with the specifications and plans provided within the solicitation. Bid Bond 5% St. Johns County reserves the right to accept or reject any or all bids/proposals, waive minor informalities, or award the bid/proposal which best serves the interests of St. Johns County. The work for this Contract is located on property owned by St. Johns County Utility Department (SJCUD) at 3575 Agriculture Center Drive St. Augustine, Florida, within County easements, and within St. Johns County (SJC) right-of-ways (ROWs). A. Furnish all labor, materials, equipment, and incidentals required to access the site, construct a new 3.0 MG (nominal volume; 2.8 MG useable volume) potable water ground storage tank, install the water main and reclaimed water main, and construct the new booster pump station and electrical building as shown on the Drawings and as specified herein B. The project will be executed through three separate contracts - Contract 1 includes the construction of the prestressed concrete ground storage tank by the TANK CONTRACTOR, Contract 2 includes electrical and I&C procurement and installation by the ELECTRICAL CONTRACTOR, and Contract 3 includes the construction of the booster pump facility and all other associated work as shown on the Drawings. The CONTRACTOR will be required and should include in their base bid all costs associated with coordinating their work with the TANK CONTRACTOR and ELECTRICAL CONTRACTOR including scheduling of work that is to be completed 1. Mobilization/demobilization, general requirements, bonds, and insurance 2. Site work a. Clearing and grubbing for the entire site property b. Excavation of pond from existing grade and import of structural fill for GST construction c. Sedimentation and erosion control measures 3. 3.0 MG nominal volume GST including all appurtenances as described in Section 13216 4. Installation of all "under" piping related to the GST. Appendix C provides a summary of what piping and fittings have been pre-purchased by the OWNER and will be provided to the TANK CONTRACTOR for installation. All other piping related to the tank shall be provided by the TANK CONTRACTOR. 5. Unloading, storage, and installation of any piping and fittings pre-purchased by the OWNER for construction of the tank 6. All materials testing required during construction 7. All permits necessary to complete the work on the tanks after it is constructed and sequencing the ELECTRICAL CONTRACTOR's work with their own. SJCUD Project No.: 4488-56302-6264-56302

51 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.