Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2022

December 15, 2022

June 6, 2023

2110 110th Ave E

Renovation

No Information to Display

$460,000.00

Public - City

img_map_placeholder

2110 110th Ave E, Edgewood, WA

Subscribe to View Full Documents

The project scope includes enclosing an 36' x 60' steel framed covered play structure with 2x6 wood-framed, insulated walls and ribbed metal siding to become a storage building. Includes selective removal of existing asphalt, new concrete floor slab with thickened edge foundation, new insulated standing seam metal roof system over existing metal deck, electrical power service, lighting, heat, and security system. Site work includes paving, drainage, fencing and landscaping. Notice to Proceed will be issued on or about December 9, 2022 and on-site work may begin December 12, 2022 after approval of all required documents. See Section 01-1100, Summary of Work for specific completion times. A certified or bank cashier's check payable to the Owner or a bid bond executed by a licensed bonding company is required with each bid, in an amount equal to five (5) percent of the Base Bid. Make payable to Puya llup School District and enclose with bid. The Owner shall have the right to reject any or all bids for any reason or for no reason, to reject a bid not accompanied by required bid security or by other data required by the Bidding Documents, or to reject a bid, which is in any way incomplete or irregular. CONVERSION OF EXISTING -2,230 SF COVERED PLAY STRUCTURE INTO AN ENCLOSED, SEMI-HEATED STORAGE BUILDING WITH NEW DRIVE ACCESS AND PEDESTRIAN ACCESS

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.