Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 15, 2022
December 15, 2022
June 6, 2023
2300 110th Ave E
Renovation
No Information to Display
$460,000.00
Public - City
2300 110th Ave E, Edgewood, WA
The project scope includes enclosing an 36' x 60' steel framed covered play structure with 2x6 wood-framed, insulated walls and ribbed metal siding to become a storage building. Includes selective removal of existing asphalt, new concrete floor slab with thickened edge foundation, new insulated standing seam metal roof system over existing metal deck, electrical power service, lighting, heat, and security system. Site work includes paving, drainage, fencing and landscaping. The formal bid clock will be the District supplied and identified bid clock. Notice to Proceed will be issued on or about December 9, 2022 and on-site work may begin December 12, 2022 after approval of all required documents. See Section 01-1100, Summary of Work for specific completion times Electronic pdf and/or hardcopy bid documents will also be supplied to qualified general contractors (2 sets) and prime civil and electrical subcontractors (1 set) bv contacting Les Gerstmann (PSD) at (253) 841-8641. There is no deposit required for bid documents, but the District requests all documents be returned within i week after the bid to ARC Tacoma at 632 Broadway. Tacoma, WA A certified or bank cashiers check payable to the Owner or a bid bond executed by a licensed bonding company is required with each bid, in an amount equal to five (5) percent of the Base Bid. Make payable to Puya llup School District and enclose with bid. The Owner shall have the right to reject any or all bids for any reason or for no reason, to reject a bid not accompanied by required bid security or by other data required by the Bidding Documents, or to reject a bid, which is in any way incomplete or irregular Completion Schedule and Milestone Dates: 1. Contract Award: On or about December 8, 2022 (as soon as possible after receipt of bids acceptable to the Owner, Post Bid Submittals and the execution of the Contract award approval process). 2. Construction Start: December 15, 2022 3. Notification of Substantial Completion: March 1, 2023 4. Substantial Completion Date: March 8, 2023 5. Completion of Punch List Items: April 7, 2023 6. Final Completion: June 6, 2023
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Edgewood, WA
Bid Date: Jul 19 2021
Edgewood, WA
Bid Date: Dec 01 2023
Edgewood, WA
--
Tukwila, WA
Bid Date: May 23 2023
Spanaway, WA
Bid Date: Jun 29 2023
Sumner, WA
Bid Date: Jul 05 2023
Bothell, WA
--
Seattle, WA
Bid Date: Aug 10 2022
Seattle, WA
Bid Date: Jan 11 2023
Seattle, WA
Bid Date: Jan 11 2023
Seattle, WA
Bid Date: May 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
