Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

April 9, 2024

October 31, 2024

Interstate 80

Outdoor Lighting, Paving, Site Work

No Information to Display

$8,000,000.00

Public - State/Provincial

img_map_placeholder

Interstate 80, Evanston, WY

Subscribe to View Full Documents

Contract Number: P511020,HIP-B233008 & STP-E-P511020 County: Uinta Est. Completion Date: Oct. 31, 2024 Pre-Qualification: Yes Description: Bridge Rehabilitation (with work on: Abutments, bridge railing, safety fence, pedestrian fence, expansion joints, deck, approach slabs, barrier and slope paving) (B233008) and Bridge Lighting System Installation (P511020). Location: UPRR Overpass structure at RM 5.31 on I-80/US 189 Bus. in the City of Evanston. WYDOT - Call Order 002 - District 3 Bridge Rehabilitation

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects