Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 25, 2024

May 1, 2027

Sheridan Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Sheridan Rd, Kenosha, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of August 3, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Transportation Region/Bureau: Southeast Region Solicitation ID: SE-04 Anticipated Construction Cost: $6,000,000-$6,999,999 Route : STH 032N County : 30 - Kenosha County, 51 - Racine County Limit : Alford Park Drive to 21st Street The pavement needs treatment to extend its service life. Improve bicycle and pedestrian accommodations. Perpetuation project to resurface approximately 5.7 miles of STH 32 from Alford Park Dr to 21st St in the Village of Somers in Kenosha County and the Village of Mount Pleasant in Racine County. Remark roadway to two though lanes and a TWLTL in several locations, add sidewalk, replace signals at 4 intersections and coordinate railroad. Right of way acquisition is anticipated The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR) Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.