Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

November 20, 2023

October 8, 2024

Multiple Locations

Site Work

No Information to Display

$4,876,211.00

Public - City

img_map_placeholder

Multiple Locations, Laredo, TX

Subscribe to View Full Documents

QUESTIONS: Due by Wednesday 5:00 PM, August 30, 2023. Submit all questions on CivCast. Water Plant in Laredo, Texas Work covered by these Technical Specifications is entitled 'Water Plant No. 1, Phase 1 for Gateway MUD No.1, Webb County, Texas.' Description of Work: a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and the Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Construct Water Plant No. 1 including all site work necessary for water plant construction, fill compacted to grade, two 252,302-gallon ground storage tanks, 6,000-gallon hydro-pneumatic tank, one 400 gpm, one 700 gpm, and two 1,400 gpm booster pumps, chlorination system, electrical and instrumentation with building and fencing for a fully operational plant. (2) Furnish and install all appurtenances and systems necessary for a fully operational plant. (3) Perform testing as specified on installed lines. (4) Clean-up project area upon completion. The Work, which shall include the furnishing of all material, equipment, labor, and supervision necessary or incidental for the construction of Water Plant No. 1, Phase 1 for Gateway MUD No. 1. The Project includes all site work necessary for water plant construction, including but not necessarily limited to fill and grading, two 252,302-gallon ground storage tanks, 6,000-gallon hydro-pneumatic tank, one 400-gpm jockey pump with VFD, one 700-gpm booster pump with VFD, two 1,400 gpm booster pumps with soft start, chlorination system, electrical and instrumentation with building, fencing including all appurtenances and systems for a fully operational plant

131 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.