Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 5, 2024

No Information to Display

59 S Main St

New Construction, Site Work

No Information to Display

$30,000,000.00

Public - City

img_map_placeholder

59 S Main St, Berkley, MA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of August 22, 2023, a firm has been selected for the feasibility study. a firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Rfs/designer Services Legal Notice Advertisement: Request for Designer Services (Rfs) Town of Berkley, Ma Berkley Public Schools the Town of Berkley is Seeking Design Services for the Berkley Community School Project in Berkley, Massachusetts. Designer Will Conduct a Feasibility Study Which Will Include the Development and Evaluation of Potential Alternative Solutions With Services Continuing Through the Schematic Design Phase of the Preferred Alternative. The Required Scope of Services is Set Forth in the Msba's Standard Contract for Designer Services. Potential Project May Include the Replacement of or Addition to the Berkley Community School in Order to Provide for a Full Range of Programs Consistent With Approved State and Local Requirements. The Project Has a Msba Design Enrollment of 385 K-4 Students, the Project is Also Anticipated to Include Space for Pre-k Students. Notice to Proceed With Designer Services is Anticipated in January of 2023. The Combined Duration for the Feasibility Study and Schematic Design Phases is Scheduled for 18 Months. Specific Professional Qualifications Required of Applicants for the Design Contract Are Listed in the Rfs. Categories of Work for Which the Designer Will Be Required to List Subconsultants Are Also Listed in the Rfs. The Fee for Basic Services Will Be Negotiated. The Estimated Construction Budget for a Potential Project May Range From $10,000,000 to $30,000,000 *the Value for This Project is Based on a Financial Range. The Value is Listed as the Highest Possible Cost From the Range Provided by a Stakeholder or Official Project Document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.