Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2023

February 22, 2023

November 19, 2023

7540 E Treasure Dr

Site Work

No Information to Display

$1,060,780.00

Public - City

img_map_placeholder

7540 E Treasure Dr, North Bay Village, FL

Subscribe to View Full Documents

PN-0190151.01, 043138022 FINANCIAL PROJECT ID-444197-1-58-01 (D6) The project site is located on Treasure Island, North Bay Village, Florida, in Miami-Dade County. It involves upgrading the current conditions of existing sidewalks and crosswalks to complement the improvements carried out under a recent ADA Sidewalk Improvement project. The project design eliminates sidewalk gaps and trip hazards caused by uneven or broken/cracked concrete. It improves/enhances pedestrian facilities with marking, signage, audible beacons, flashing beacons, and ADA-compliant crosswalks/ramp. North Bay Village is seeking to construct the Baywalk Plaza Area North: Phase 1 overlooking Biscayne Bay in North Bay Village. This Baywalk Plaza area is now known as a part of Island Walk. Once completed, the Baywalk Plaza Area North : Phase 1 will consist of two plaza areas at the base of the John F. Kennedy Causeway (NW 79th Street) bridge that links North Bay Village to Miami Beach, at the Village's easternmost area. The South Plaza across the Causeway has already been constructed with plans in future to connect it to this North Plaza project with a walkway beneath the bridge. The North Plaza offers public access to the lntracoastal Waterway/Biscayne Bay and provides access to the future Island Walk/ Boardwalk project. Once completed, the Island Walk/Boardwalk project, a 3,400 linear foot trail overlooking Biscayne Bay, will provide bicycle and pedestrian facilities, seating, and links to the 79th Street bike lanes. Deadline for Written Questions To be sent to aatkinson@nbvillage.com Wednesday, January 4, 2023 4:00 PM *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. . FM444197-1-58-01 Primes - major work classes fall under: sidewalk, curbs & gutter; pavement markings; Sub-prime - contractor - traffic controller system, electrical work; class 8 - electrical work; class 12 - grassing, seeding and sodding; class 28 - pavement marking; class 39- traffic signal; class 40 - sidewalk B. FM440846-1-58-01 Primes- major work classes fall under: sidewalk, curbs&gutter; pavement markings; Sub-prime - contractor - traffic controller system, electrical work; class 8 - electrical work; class 12 - grassing, seeding and sodding; class 28 - pavement marking; class 39- traffic signal; class 40 - sidewalk

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.