Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 6, 2023

No Information to Display

I-70

Paving, Site Work

No Information to Display

$44,630,485.00

Public - State/Provincial

img_map_placeholder

I-70, Greens Fork, IN

Subscribe to View Full Documents

As of October 25, 2023, a contractor has been selected. Further details regarding construction have not been identified. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: Owner Office Greenfield District / Capital Program Mgmt Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 9.3% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 Project Development Services HMA Overlay, Preventive Maintenance and 17 Bridge Rehabilitations on I-70 in Henry and Wayne Counties The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents in accordance with the INDOT project development process. The selected firm shall complete an Engineering Assessment (if necessary), Topographic Survey, Design and Plan Development, Hydraulic Analysis, Environmental Documentation, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, (if needed), Real Estate Acquisition Services, Geotechnical Engineering, Utility Coordination, Pavement Design, Construction Phase Services and other related services as needed. Other services such as Traffic Signal Design, Lighting Design, Ecological Surveys, Archeological Investigations, Historical/Architectural Investigation, and Wetland Mitigation, may be included later if these work types become necessary. The selected firm's fee proposal shall be due 45 calendar days after the selection date for this RFP item. 2200811 HMA Overlay, Preventive Maintenance on I-70, 0.49 mi W of SR 3 to 0.47 mi W of SR 1, in Henry and Wayne Cos. RP 122+056 to RP 136+087, including two Bridge Deck Replacements, two Superstructure Replacements, six Bridge Deck Overlays, three Bridge Thin Deck Overlays and four Bridge Paintings (18 DES numbers in total) $44,630,485.00 Riggs, Nathan Prequalification Required: Yes The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Project Development Services HMA Overlay

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.