Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 21, 2023

July 31, 2023

July 30, 2024

1335 W Main St

Paving, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

1335 W Main St, Lander, WY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Furnishing labor, equipment, supplies, and materials, to reconstruct a native surface road. The work includes ripping, reshaping the roadway, reestablishing ditches, reducing and removing from the roadway rock larger than 4 inches; watering, mixing, blading and shaping, compacting, and placement of surface rock and stabilization. 1. The reconstructed Shoshone Lakes Road width shall be a minimum of fourteen (14) feet for approximately 2.6 mile. 2. Stabilization The chemical treatment of Perma-Zyme 11x TM a. Shall be the entire length and width of the roadway and shall be six (4) inches deep as per manufactures specifications. b. Shall include watering needed for compacting 3. Apply seed to staging areas and any additional disturbed areas outside of the ditches identified by the Government with approved BLM seed mixture. Minimum Requirements for a Responsive Proposal 1. Filled out, dated, priced SF1442 2. Technical Response - See Section L and M for details 3. Bid Bond 20% Questions Due Date: June 30, 2023 - 4:30 PM Mountain Time Date: June 22, 2023 T - ime: 10:00 AM Meeting Place: The start of the project is at Latitude 42.83947 and Longitude -108.87093 Special Instructions: The project area is located in Fremont County. Shoshone Lake Road is accessed via Bunker Creek Rd (County) approximately 7.7 miles from the Highway 287/Baldwin Creek Road intersection in Lander, Wyoming. Point of Contact for Site Visit: Jake Brown Role/Title: COR Phone: (307) 347-5239 Email: jbrown@blm.gov FAR Magnitude: Between $100,000 and $250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.