Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 22, 2023

April 1, 2024

November 30, 2027

155 Bayview Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

155 Bayview Ave, Toronto, ON

Subscribe to View Full Documents

Question Deadline: July 28, 2023. The scope of work of this contract includes but is not limited to: - Construction of one abutment on the east side of the Don Valley Parkway (DVP) and one on the west side of the Don River. Each abutment consists of two (2) 2.4m diameter deep foundation caissons socketed into bedrock; - Construction of the bridge superstructure for a tied arch 120 metre clear span that will carry two (2) Ontario Line tracks over the Don Valley Parkway ("DVP") and Don River; - Construction of cut and cover structures and portal structures. - Installation of Support of Excavation (SOE) which includes permanent structural lining of the OL cut and cover tunnels and portal, and tunnel headwall with pile block; - Track relocations and removals within the project area to provide space for the proposed SOE construction and final track alignments; - Construction of Hydro One Network Inc (HONI) foundations, installation of HONI monopole and wire relocation; - Construction of the Emergency Service Building (ESB) and connections to City of Toronto service infrastructure; - Construction and Installation of a noise barrier structure; - Construction of a Wet-Well for tunnel stormwater drainage; - Associated Utility and Signal Relocations to facilitate the construction of the above; and - Site remediation and restoration as required. The Work is located within the West Don Lands Rail Corridor (Closest Address: 155 Bayview Ave, Toronto, ON M5A OG4) SCHEDULE INFORMATION: Baseline Tracking Milestone: Lower Don Bridge East Abutment - April 1 2024. Interim Milestone 1: Hydro One Transmission Line Relocate - April 30, 2025. Interim Milestone 2: Handover Termination Block Headwall - August 5, 2025. Interim Milestone 3: Northern Track Shift in service - April 1, 2026. Interim Milestone 4: Handover Cut and Cover Structure - April 20, 2026. Substantial Completion - August 31, 2027. Only those Proponents that Metrolinx has determined, in its sole discretion based on the Evaluation Criteria stated herein, to be qualified will be added to the Metrolinx Prequalified List of Contractors for the Work. Official bid documents must be obtained from www.metrolinx.merx.com and bid submissions must be done through the Merx platform. RFS-2019-NAFC-110

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.