Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 22, 2023
April 1, 2024
November 30, 2027
155 Bayview Ave
Paving, Site Work
No Information to Display
No Information to Display
Public - State/Provincial
155 Bayview Ave, Toronto, ON
Question Deadline: July 28, 2023. The scope of work of this contract includes but is not limited to: - Construction of one abutment on the east side of the Don Valley Parkway (DVP) and one on the west side of the Don River. Each abutment consists of two (2) 2.4m diameter deep foundation caissons socketed into bedrock; - Construction of the bridge superstructure for a tied arch 120 metre clear span that will carry two (2) Ontario Line tracks over the Don Valley Parkway ("DVP") and Don River; - Construction of cut and cover structures and portal structures. - Installation of Support of Excavation (SOE) which includes permanent structural lining of the OL cut and cover tunnels and portal, and tunnel headwall with pile block; - Track relocations and removals within the project area to provide space for the proposed SOE construction and final track alignments; - Construction of Hydro One Network Inc (HONI) foundations, installation of HONI monopole and wire relocation; - Construction of the Emergency Service Building (ESB) and connections to City of Toronto service infrastructure; - Construction and Installation of a noise barrier structure; - Construction of a Wet-Well for tunnel stormwater drainage; - Associated Utility and Signal Relocations to facilitate the construction of the above; and - Site remediation and restoration as required. The Work is located within the West Don Lands Rail Corridor (Closest Address: 155 Bayview Ave, Toronto, ON M5A OG4) SCHEDULE INFORMATION: Baseline Tracking Milestone: Lower Don Bridge East Abutment - April 1 2024. Interim Milestone 1: Hydro One Transmission Line Relocate - April 30, 2025. Interim Milestone 2: Handover Termination Block Headwall - August 5, 2025. Interim Milestone 3: Northern Track Shift in service - April 1, 2026. Interim Milestone 4: Handover Cut and Cover Structure - April 20, 2026. Substantial Completion - August 31, 2027. Only those Proponents that Metrolinx has determined, in its sole discretion based on the Evaluation Criteria stated herein, to be qualified will be added to the Metrolinx Prequalified List of Contractors for the Work. Official bid documents must be obtained from www.metrolinx.merx.com and bid submissions must be done through the Merx platform. RFS-2019-NAFC-110
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Toronto, ON
--
Toronto, ON
Bid Date: Sep 06 2023
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Aug 11 2023
Toronto, ON
--
Toronto, ON
Bid Date: Aug 25 2023
Toronto, ON
Bid Date: Aug 03 2023
Toronto, ON
--
Toronto, ON
Bid Date: Aug 03 2023
Toronto, ON
Bid Date: Aug 03 2023
Toronto, ON
Bid Date: Jun 08 2023
Toronto, ON
--
Toronto, ON
Bid Date: Aug 03 2023
Toronto, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
