Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 8, 2024

No Information to Display

13333 Lanier Rd

Demolition, New Construction, Site Work

No Information to Display

$10,000,000.00

Public - County

img_map_placeholder

13333 Lanier Rd, Jacksonville, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Perry-McCall Construction has been selected by Duval County Public Schools as Construction Manager on their new LOUIS S. SHEFFIELD ELEMNTARY SCHOOL project. We are currently soliciting subcontractor bid proposals for the following trade package: 01A Final Cleaning & Continuous Cleaning 01B Material Testing 01C Night Security 01D BIM Coordination 01E Envelope Consultant 01F Temporary Jobsite Fencing 01G Photo Documentation 02A Sitework 02B Soil Treatment 02C Fencing 02D Landscape & Irrigation 03A Precast Concrete-Awarded 03B Concrete 04A Masonry 05A Structural Steel 06A Casework 07A Roofing - TPO, Metal & CMP 07B Caulking & Waterproofing 08A Door/Frame/Hardware 08B Glass & Windows 08C Rolling Security Grilles 08D Wall Louvers 08E Interior Folding Glazing 08F Glazing/Security Vision Film 09A Drywall 09B Flooring 09C Painting 09D Stucco 09E Resinous Flooring 09F Acoustic Ceilings 10A Misc Specialties 10B Signage 10C Canopies 10D Lockers 11A Food Service 11B Stage Curtains 11C Athletic Equipment 11D Outdoor Athletic Surfacing 12A Window Blinds 13A Pre-Engineered Mtl Bldg 14A Elevators 21A Fire Protection 22A Plumbing 23A HVAC 26A Electrical & Fire Alarm Prior to submitting a bid proposal, subcontractors are required to review all bid related information, including plans, specifications, geotechnical report, bid scopes of work, Perry-McCall subcontract agreement, schedule and complete subcontractor's pre-qualification (""SCORE""). SCORE registration information can be found online. SCORE must be fully complete, including financial information, one week prior to the bid due date. Any proposed comments to Perry-McCall's subcontract agreement template must be submitted with subcontractor's bid. Any incomplete submissions of the requirements listed above may be subject to bid rejection. Instructions:

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.