Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 11, 2023

November 22, 2023

Plumwood Dr

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Plumwood Dr, West Des Moines, IA

Subscribe to View Full Documents

The project involves repairing deteriorated storm sewer infrastructure and protecting sanitary sewer infrastructure through installation of countermeasures along an impaired overland drainage channel at the location shown in the plans. Work includes removing an existing end section and timber retaining wall and installing new sections of reinforced concrete pipe, apron, and outlet protection. Work also includes installation of fabric formed concrete revetment armor units or grout mats along the channel. Excavation and site work necessary to perform this work including erosion controls, clearing and grubbing, surface restoration and other related work are also included. The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of four (4) years from the time of acceptance by the City. Work on said project shall commence within ten (10) days of the written notice to proceed and shall be completed by November 22, 2023. Liquidated damages in the amount of five hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the end of the contract period. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.