Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2022

August 29, 2022

February 25, 2023

423 Alabama Ave

Site Work

No Information to Display

$462,330.00

Public - City

img_map_placeholder

423 Alabama Ave, Clarksville, TN

Subscribe to View Full Documents

**As of August 9, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** **As of August 2, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the following Work: The work to be performed (Work) consists of sandblasting, welding, pit filling and painting the High Point Tank, which is a 1.5 million gallon ground storage tank located at 423 Alabama Avenue, Clarksville, Tennessee. Additionally, certain maintenance and repair items are to be accomplished. The Contractor shall be responsible for all costs associated with sampling, disinfection, traffic control, worker protection, environmental pollution control, handling of debris, laboratory analysis, waste disposal and all other ancillary actions required to complete the Work as shown on the Drawings and as set out more fully in the Specifications. Contractor shall provide all necessary materials, labor and equipment to complete the Work. Bids are requested for the following single prime Contract. The Project has an expected duration of 150 days to Substantial Completion after the date when the Contract Times commence to run and 180 days to readiness for final payment after the date when the Contract Times commence to run. EJCDC(R) C-111, Advertisement for Bids for Construction Contract. This document is a MODIFIED version of EJCDC(R) C-111, Copyright@ 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright. This document is a MODIFIED version of EJCDC(R) C-111, Copyright(C) 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.