Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 30, 2023

May 27, 2024

601 Yucca St

Paving, Site Work

No Information to Display

$5,636,354.00

Public - City

img_map_placeholder

601 Yucca St, Boulder City, NV

Subscribe to View Full Documents

This work shall include furnishing all labor, material, and equipment to complete the project RAILROAD MUSEUM ROAD as described in the specifications and shown in the plans. Work includes the construction of a new road from Yucca Street to Mescal Street as shown on the plans. This work shall also include construction of water, sewer and electric utilities, curb and gutter, sidewalk, driveways, streetlights, irrigation and landscaping, connections to existing services, striping, signage, and electrical equipment purchases for installation by City crews. The work shall also include coordination with City crews for connection to existing infrastructure for water, sewer and electric utilities. City crews will be responsible for the removal of the existing overhead lines and poles once the new electrical conduits have been installed and the new underground electric system is placed in service. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner ENGINEER'S ESTIMATE OF PROBABLE COST: $ 5,150,000 - $ 5,350,000 PRE-BID CONFERENCE: A pre-bid conference will not be held for this project PROPOSAL GUARANTEE: Each proposal shall be accompanied by a certified or cashier's check orbid bond in an amount not less than ten percent (10%) of the total bid price All questionsrelative to this project prior to the opening of bids shall be completed utilizing the Nevada Government eMarketplace (NGEM) question portal. Question Deadline: 8/21/2023 12:00 PM (PT)

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects