Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 27, 2023

November 15, 2023

August 31, 2025

Whithorn Cres & MacLachlan Ave

New Construction, Site Work

No Information to Display

$26,000,000.00

Public - State/Provincial

img_map_placeholder

Whithorn Cres & MacLachlan Ave, Haldimand, ON

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

General Contractors for Joint Caledonia School (Brant Haldimand Norfolk Catholic District School Board and Grand Erie District School Board). The Board wishes to prequalify Contractors interested in acting as General Contractor for the Joint Caledonia Elementary School at the intersection of MacLachlan Avenue and Whithorn Crescent, Caledonia, Ontario. Only Contractors that have been prequalified by the Board will be invited to submit a bid for the project. The Board reserves the right to limit the number of Contractors prequalified as part of this process. Contractors who have been previously prequalified or who are currently performing work for the Board must also respond to this request. Contractors that do not participate in this prequalification process will be excluded from bidding on the project. The most qualified Contractors resulting from this prequalification, up to a maximum of eight (8) Contractors, will be invited to participate in the second-stage [RFx] process in accordance with Part 4 - Evaluation. The Brant Haldimand Norfolk Catholic District School Board, together with the Grand Erie District School Board are currently in the design phase of a new school facility comprised of two separate elementary schools (one for each school board) and a Child Care Centre consolidated into one single building, located in Caledonia, Ontario. The Board, together with the GEDSB are currently in the design phase of a new school facility comprised of two separate elementary schools (one for each school board) and a Child Care Centre consolidated into one single building, located in Caledonia, Ontario. The scope of work associated with the project is generally described as follows: 1. The total facility size is to be approximately 76,000 sq ft in total area comprised of the following elements: 2. The Board facility will be home to approximately 305 students; 3. The GEDSB facility will be home to approximately 441 students as well as a Child Care Centre; 4. The school facility will include shared spaces such as the gymnasium, change rooms and library; 5. Car Parking areas, access ways and outdoor amenities serving the facility; 6. Landscape areas include playgrounds, open space recreation areas, walkways, fencing, lighting; and 7. Storm Water Management and associated on-site storm water storage. TIMELINE: Five (5) firms have prequalified for this project. As of October 13, 2023, the Stage II invited tender timeline to the prequalified firms has yet to be determined. RFQ documents stated the facility is expected to be operational by the end of August 2025 for the school occupancy in September 2025.

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.