Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

January 1, 2024

December 1, 2024

Multiple Locations

Site Work

No Information to Display

$88,200.00

Public - City

img_map_placeholder

Multiple Locations, Tipton, IA

Subscribe to View Full Documents

Installation of Owner furnished 15kv power cables in existing raceway at the generation plant; terminating, phasing, and testing underground power cables installed by others; overhead line work shown on project drawings; installing grounding for electrical equipment; and related work using Owner furnished materials in Tipton, Iowa. The total estimated project cost is $1,500,000. The estimated cost of the Electric Construction - Labor Only is $150,000.00 Contract Time Information Start Date: January 1, 2024 Completion: December 1, 2024. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Contractors may obtain a copy of the project documents by emailing the Owners representative: dcharles@shermco.com. All bids shall be made on proposal forms furnished in the project documents and shall be accompanied by bid security in the form of a certified check or bid bond, made payable to City of Tipton in the amount of ten percent (10%) of the bid, which security becomes the property of Tipton in the event the successful bidder fails to enter into a contract and post satisfactory performance and payment bonds. Payment to the Contractor will be made on the basis of ninety-five percent (95%) construction progress payments for work completed according to the schedule of values submitted by the Contractor with a five percent (5%) retention held. The total five percent (5%) retention held will be released at the completion of construction according to the Contract documents. Tipton reserves the right to waive irregularities and to reject bids.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.