Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 22, 2022

September 1, 2022

September 1, 2024

Multiple Locations

New Construction, Site Work

No Information to Display

$119,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Andover, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Town of Andover is seeking Statements of Qualifications for elevator contractors for the construction of the new 191,000 square foot West Elementary and Shawsheen Preschool and associated demolition and sitework. The new project will be located at the site of the existing West Elementary at 58 Beacon Street. All questions shall be submitted in writing via e-mail to Brian DeFilippis at bdefilippis@PMAConsultants.com referencing West Elementary and Shawsheen Preschool RFQ Questions in the subject line. Andover is an affirmative action/ equal opportunity purchaser. The Town reserves the right to accept or reject, in whole or in part, any or all proposals or take whatever other action may be deemed necessary to be in the best interest of the Town 1. Project is the construction of a new elementary school located on the site of the existing Andover West Elementary School facility, at 58 Beacon Street in Andover, Massachusetts. The project includes construction of a new school building, with classrooms, gymnasium, and dining commons including a raised platform, and outdoor playground facilities with play structures. Also included in the project is the abatement and demolition of the existing building and construction of access drives, parking and associated site work including construction of a synthetic turf field for outdoor playfields and playgrounds. 2. The new Andover West Elementary and Shawsheen Preschool will serve PreKindergarten (replacing the existing Shawsheen Pre-K School programs), Kindergarten and elementary Grades 1 through 5. It is designed for an enrollment of 1,055 students and is 191,028 gross square feet. Estimated Construction Cost: $119,000,000 Estimated Project Duration: Phase 1: 24 months Phase 2: 12 months

259 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.