Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

August 2, 2024

105 Garfield Ave

Renovation

No Information to Display

$643,200.00

Public - State/Provincial

img_map_placeholder

105 Garfield Ave, Eau Claire, WI

Subscribe to View Full Documents

This project will remove the existing walk-in cooler/freezer unit and install a new walk-in cooler/freezer of the same size (1500 sq ft), configuration, and location. The unit contains 1 freezer section and 6 separate cooler sections. Existing condensing units in an adjacent room will be removed and replaced. Disconnect the existing electrical connections and reconnect new system. Patch adjacent walls and repaint. Rework ceiling/soffit and grid system around new units. This project will apply a new coat of epoxy adjacent to the new units as well as surrounding kitchen areas with a total of 8667 SF. Contractor to remove the existing walk-in cooler/freezer units and install new walk-in cooler/freezer units of the same overall size (approximately one thousand, four hundred square feet), and location (First Floor which is up one level from grade via stairs or elevator), but with an altered interior configuration. The existing units involve two freezer sections and five cooler sections. The new configuration will consist of two freezer sections and three cooler sections. Existing condensing units in an adjacent room will be removed and replaced. Disconnect the existing electrical connections and reconnect new system. Patch adjacent walls and repaint. Rework ceiling/soffit and grid system around new units. This project will repair/replace floor surfaces and fillers adjacent to the coolers and freezers and apply a new coat of epoxy floor finish adjacent to the new units as well as surrounding kitchen areas. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. UW Eau Claire, Hilltop Building, Main Entrance (west end). It is encouraged that contractors attend. Please contact Lien & Peterson Architects, Greg Granlund, 715-835-7500, gregoryg@2dlp.com for additional information

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details