Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 26, 2022

December 14, 2022

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

Multiple Locations, Tooele, UT

Subscribe to View Full Documents

Question Submission Close Date 5/20/2022 5:00 PM MDT The project is to be completed within 120 calendar days of the Notice to Proceed Work of this Construction Contract for the Pole Canyon and Center Street ReAlignment Project comprises the following general roadway improvement construction elements including but limited to: clear and grub new alignment; shape grade and compact sub-grade, pulverize existing asphalt for reuse as embankment material, construction of the Pole Canyon and Center Street new roadway re-alignment embankments using pulverized asphalt and untreated base course and imported Granular Borrow material based on the new alignments; new untreated base course and asphalt pavement; storm drainage swale construction; storm drainage piping and boxes, regrade and reshape shoulders; surface restoration/improvements, signage and striping, removal of existing fencing and install new wire fencing, adjust utilities boxes to finish grade and all other elements for a complete job. The project work is located on Pole Canyon Road east of State Route SR-36 to a new intersection of Pole Canyon Road and the new alignment of Center Street then north on Center Street to the connection of the new alignment of Center Street with current alignment of Center Street. Also, included is the traffic signalization on the easterly side ofSR-36 with the new Pole Canyon Road intersection all in Tooele County, Utah

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.