Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 29, 2022
September 21, 2022
December 20, 2022
1 Detroit Metro Airport
Site Work
No Information to Display
$50,000.00
Public - County
1 Detroit Metro Airport, Detroit, MI
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Soliciting bids from general contractors, construction managers and other businesses that meet the qualifications set forth herein for the installation of bird netting and cleaning/removal of existing bird droppings underneath the bridge structure at the McNamara Terminal Arrivals Level curbside and adjacent roadway at Detroit Metropolitan Wayne County Airport. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: The Contractor shall furnish an AIA 311 Performance Bond and an AIA 311 Labor and Material Payment Bond (AIA 312 forms will not be accepted). Both Bonds shall be in an amount equal to 100% of the Contract Sum and shall comply with the requirements set forth in Article 10 of the General Terms and Conditions. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: The Contractor shall furnish an AIA 311 Performance Bond and an AIA 311 Labor and Material Payment Bond (AIA 312 forms will not be accepted). Both Bonds shall be in an amount equal to 100% of the Contract Sum and shall comply with the requirements set forth in Article 10 of the General Terms and Conditions. Substantial Completion of Construction - shall be achieved within 60 calendar days of the NTP for construction. The number of days that vehicle lanes are barricaded and work activity at the site is occurring shall not exceed 30 days (an average of 10 days for each of the three phase shown on the Drawings. Once Substantial Completion of the construction work has been achieved, the Contractor shall remove all equipment and temporary traffic control devices from the site. Final Completion - Construction work including all restoration, cleanup, completion of punch list and removal of temporary traffic control and safety devices shall be no later than 30 calendar days after the Substantial Completion date. Construction will not be considered to be complete unless all project construction tasks are completed. Final Completion and submittal of Final Contractor's Pay Application to the Airport Authority shall be completed no later than 60 calendar days after Substantial Completion date. All questions regarding this RFB must be submitted to the Procurement Contact at the above number and email address. Contact concerning this RFB with any other employee, officer or Board Member of the Airport Authority is not permitted during the solicitation process. Pre-Bid Question Deadline August 16, 2022 2:00 PM Eastern Time CANCELLATION OF RFB The Airport Authority reserves the right to cancel this solicitation, in whole or in part, as well as reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the Chief Executive Officer (CEO) or his designee that the best interest of the Airport Authority will be served by so doing. If the solicitation is cancelled or all bids are rejected by the Airport Authority.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Detroit, MI
Bid Date: Feb 21 2019
Detroit, MI
Bid Date: Dec 16 2021
Detroit, MI
Bid Date: Aug 18 2023
Detroit, MI
Bid Date: Sep 12 2023
Detroit, MI
Bid Date: Jun 08 2023
Detroit, MI
Bid Date: Apr 05 2022
Detroit, MI
Bid Date: May 04 2023
Detroit, MI
Bid Date: Aug 28 2023
Detroit, MI
Bid Date: Aug 28 2023
Detroit, MI
Bid Date: Aug 29 2023
Detroit, MI
Bid Date: Sep 29 2023
Detroit, MI
Bid Date: Jun 30 2023
Detroit, MI
Bid Date: Sep 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
