Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 3, 2022

June 2, 2022

November 29, 2022

Liberty Hi Rd

Site Work

No Information to Display

$909,505.00

Public - City

img_map_placeholder

Liberty Hi Rd, Bowling Green, OH

Subscribe to View Full Documents

In general, the work consists of extending approximately 7,000 feet of 8-inch water main along Liberty Hi Road from the dead end on Euler Road to Poe Road and approximately 2,000 of 8-inch water main along Gorrill Road extending east of Liberty Hi Road. The work shall also include new fire hydrants, valves and water services including water meters and meter pits and restoration of disturbed areas. Water services will be provided to customers as shown. Neither Owner nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. The Contractor shall be required to pay not less than the prevailing wage rates established by the federal Davis-Bacon Wage Determinations issued by the U.S. Department of Labor. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 90 days after the actual opening thereof. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects