Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 21, 2022

June 20, 2022

September 3, 2022

Multiple Locations

Site Work

No Information to Display

$588,952.00

Public - City

img_map_placeholder

Multiple Locations, Danvers, MA

Subscribe to View Full Documents

Construction of Comprehensive Sewer System Rehabilitation. There will be no pre-bid meeting. Work includes furnishing all labor, materials, equipment to perform CCTV & Cleaning 8" & 10" sewers & rehab of sewers through spot replacement, CIPP lining, service lateral connection, full length lateral lining and manhole rehab. Estimated Cost $1.6 million. The work of this Contract includes furnishing all labor, materials, and equipment necessary to perform CCTV and cleaning of 8" and 10" sewers as well as rehabilitation of sewers through spot replacement, cured-in-place pipe (CIPP) lining, service lateral connection lining/or grouting, full length lateral lining, and manhole rehabilitation. Scope of work includes, but is not limited to the following: preparatory cleaning of sewers, service laterals, and manholes where required, including heavy cleaning where required; CCTV inspection; excavation and replacement of 8-inch sewers and service laterals; removal of protruding taps; CIPP lining of 8-inch and 10-inch gravity sewer; reinstating and installing service lateral connection liners or grout in 4-inch, 5-inch, and 6-inch services extending a minimum of 24-in into the lateral; installing full length service lateral liners extending the full length of active service laterals; management of all mainline and service flow; manhole rehabilitation including epoxy interior manhole lining; cleaning; removal of existing lining systems where required; resetting existing manhole frames and covers; installation of new manhole frames and covers and new bolt down frames and covers; filling of exterior drop connections and installation of new interior drop connections; removal of manhole steps; rock and boulder excavation, and all miscellaneous work and cleanup required to complete the work. The Contract Time for the Base Bid shall be a total of 75 Calendar Days, excluding final paving, commencing twenty (20) days following the Effective Date of the Agreement. Additional Contract Time for Additive Alternate 1 shall be 30 Calendar Days. Final Paving shall be completed in 14 consecutive calendar days and no later than June 30, 2023. See Summary, Section 011000, for additional sequencing requirements. All questions about the meaning or intent of the Contract Documents shall be received in writing by CDM Smith, 75 State Street, Suite 701, Boston, MA 02109 Attn: David Burnett or at burnettdp@cdmsmith.com, at least five (5) days before the date set herein for the opening of bids.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.