Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

January 15, 2024

No Information to Display

2425 Pine St

Outdoor Lighting, Paving, Renovation, Site Work

No Information to Display

$6,677,578.00

Public - City

img_map_placeholder

2425 Pine St, Dallas, TX

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Scope of Work. The Work consists of: ORG # 201 - Charles Rice Learning Center - Project consists of the following: 1. Provide security updates including cameras, card access readers and door contacts. 2. Provide secure front vestibule. 3. Renovate and expand administration. 4. Replace exterior waterproofing/sealant joints. 5. Add ramp to access public right of way from main entry. 6. Replace fire alarm system. 7. Provide exterior lighting controls. 8. Replace exterior lights with LED lighting. 9. Provide/replace IDF/MDF air conditioning. 10. Replace educational casework in all classrooms. 11. Remove and replace ceiling with new acoustical lay-in ceiling tile and grid throughout facility (except at areas of renovation). 12. Replace carpet/vinyl composite tile (VCT) and base throughout facility excluding all main corridors, auditorium and athletic areas (include ACM abatement where applicable and except at areas of renovation). 13. Replace teaching surfaces at each classroom. 14. Paint all previously painted interior surfaces. Repair/patch walls prior to painting (except at areas of renovation). 15. Provide new marquee. 16. Replace existing wood gym floor (include re-striping). 17. Paint all previously painted exterior surfaces and power wash as required. Provide new landscaping and sidewalk replacement as required. Construct new front entry canopy. 18. Replace modified bitumen roof system. 19. Perform mild detergent medium pressure wash on stained or mildewed facade. 20. Provide interior lighting controls. 21. Replace interior lights with LED lighting. 22. Mechanical/HVAC improvement including new split system and rooftop units, replace condenser water piping, controls, condenser water pumps, and air cooled chiller. 23. Plumbing improvements include replacing gas piping, waste piping and hot water heater. 24. Provide new flexible 'next gen' furniture. Technical questions and all other questions related to this solicitation are to be referred to: Attention: Dallas ISD Procurement Services Email: ProcurementCS@dallasisd.org Question Deadline 10/31/2023

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.