Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 2, 2024

April 1, 2025

Multiple Locations

Renovation, Site Work

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Victoria, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

New backup power systems for the Highland Fernwood water treatment plant and ancillary booster pumps by reviewing and evaluating existing system capacities, providing equipment recommendations and system design. Standby power at the following locations located on Salt Spring Island. 1. Highland Fernwood Water Treatment Plant located at the end of Maycock Road. 2. Highland Middle Reservoir located adjacent to 136 Trincomali Heights Road. 3. Highland Upper Reservoir located adjacent to 240 Trincomali Heights Road. TIMELINE: Project is pending funding. Design is ongoing. Schedules for tender and construction timelines may be confirmed in summer 2024, pending approvals.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects