Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 5, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$2,631,250.00

Public - County

img_map_placeholder

Multiple Locations, Bolivia, NC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Northwest Water Treatment Plant to Bell Swamp Water Transmission Project (the "Bell Swamp Water Transmission Project") has emerged as a vital initiative to address the increased demand for water resources in the project area. The project includes two (2) sections of water main. The first section is approximately 21,000 feet of 36" water main, which will start from the Bell Swamp GST to Maco Rd./Hwy 17 intersection, and the second section will include approximately 31,000 feet of 36" water mains from Maco Rd./Hwy 17 to Hwy 74/76 via Hwy 140. The expanded capacity will serve existing areas, currently unserved areas, and economic development sites. Brunswick County is requesting qualifications statements from qualified engineering, environmental, and water resource firms for the services associated with design and engineering of the Northwest Water Treatment Plant to Bell Swamp Water Transmission Project (Bell Swamp Water Transmission Project). The Bell Swamp Water Transmission Project includes approximately 52,000 linear feet of 36-inch water main that begins from Bell Swamp GST and extends through Highway 140, where it will connect with the water main that directly distributes water from the Northwest Water Treatment Plant. The Bell Swamp Water Transmission Project is estimated to cost $2,631,250.00 All questions or comments shall be submitted in writing by November 13, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.